Relocated from New Jersey and installed in Arizona for a hospital.
This government office building was relocated from California and installed in Colorado and repurposed as a migrant worker camp.
This is an expandable school building design by MBA. Each classroom is two pieces connected with porch at the entrance.
This was a new modular project in Fort Worth. This project required MBA to pull permits for the client and then install our welded steel strip-footer foundation system.
MBA relocated this building from Kansas to South Texas. This project required extensive site work to prepare the ‘jungle’ for the building. MBA handled permits and installed our welded steel strip-footer foundation.
This is a great example of using color on the veneer to frame the building.
This was a conceptual drawing of a design project we handled in Fort Myers Florida
MBA relocated this office building from Kansas to New Mexico. A hot air balloon nearly landed on us during the installation.
This MBA project was in Denton Texas and required extensive site work such as a sanitary sewer line that crossed three parking lots and required a pump station. MBA handled permits, site development, utility connections, site excavations and egress for this used hospital clinic.
MBA assisted this customer in Euless Texas secure special permit approval by working with their local building inspection department and getting approval from their variance committee members. We had to build a ramp that stretched over a drainage ditch during heavy rains.
The owner of this building in Dallas Texas contacted MBA about a relocation. MBA moved the building twice. The second time the customer had us move it to another site across town. MBA handled all permits for both moves and all construction activity to get the building ready for occupancy.
This was a lease customer in Houston Texas. They also had another two-plex building inside their warehouse from MBA. This project involved permits, installation and the warehouse building required fire suppression installation.
This building in north Fort Worth Texas was a complete gut and remodel from a construction office to a six-classroom design. MBA handled all aspects of the project from rebuilding the interior to foundation to building installation.
The key element in modular design is making the building look like a planned addition and not an afterthought. This building has a metal mansard matching the metal roof of the main facility. The block siding matches the church building veneer.
Never be afraid to try something new, MBA removed the exterior end wall of this used modular building and created this fantastic porch. Used as a church office in Fort Worth Texas.
This building started out as a church worship facility outside Dallas Fort Worth. It was relocated to Canyon Lake Texas and used as a community service building. MBA helped the local Baptist Association that owned this portable to sell it
This project in north Dallas involved multiple buildings being dismantled and removed from the site for the seller. It was then relocated to Granbury Texas as a new school campus.
This church in Copper Canyon Texas purchased two buildings from MBA and proceeded to remodeled both. MBA provided our welded steel foundation strip footer and building installation.
This building was relocated from North Carolina to Mississippi for a private church school.
Interesting project in Arizona. MBA provided our welded steel strip-footer foundation, handled building installation and provided egress steps.
This is an expandable office design from New Standard Stock. A two-unit complex can be enlarged to a 5-plex simply by adding three interior sections. We had a project where we expanded a two-unit complex into a four-unit complex over the weekend.
This used building was owned by another modular company in another part of the United States. We work with local companies whenever possible.
A Plano Texas church used this building as their youth worship facility, but now it is the primary worship space for a small congregation in Sunnyvale Texas. Notice the higher ceilings and open interior with just a couple roof support posts.
Modular buildings provide affordable square footage. Make the most of your savings and invest in quality furniture.
Modular buildings can be constructed with special features such as security rooms based upon your specific needs.
This Kingwood Texas school designed a cafeteria inside their education wing.
There are multiple ways to design your school hallway. Ask MBA how.
MBA has new and used portable classroom buildings for sale.
MBA can also provide assistance with the hundreds of other items required for building occupancy from foundation construction to building financing.
Love the colors in this used building.
MBA provides new and used classrooms.
The modular church design above involves raising the roof on site after delivery to create a big open interior to be used as a worship center.
Notice the books. Books are heavy. Support under the floor should be handled in the planning stage.
Open designs allow flexibility.
Sound control is critical and requires planning prior to construction.
This interior could be open even more by using a steel clear span roof truss.
QUIET! You must plan for sound control in places of worship, meeting rooms, classrooms etc. Specifications are key.
This Dallas office building was remodeled as a school building.
Science labs require special consideration especially if you are using burners and chemicals.
How much weight does the floor load need to be with a library?
You can use a false mansard around the roof to change the appearance.
Project in North Carolina. And I must say, the people in the Carolinas are some of the nicest people in America!
This education wing has a contral hallway to control student flow.
This building was a call center which required specifications focused on sound control.
This building in Manhattan Kansas was relocated to Albuquerque New Mexico.
This nice interior was in a building in Irving Texas. It was relocated to Harlingen Texas near the Mexican border.
Use oversize windows and roof projections to change the building appearance.
Use a door positioned in the corner to change the typical modular building appearance.